DFM Telangana Scoping study
From DFM Wiki
Revision as of 08:36, 5 October 2021 by EricThrift (talk | contribs)
Terms of reference
- 30-40 pages scoping study report.
- Subject to modifications agreed upon with the Project Director, the report will follow the report structure given in the document DFM Guideline: Scoping report structure.
Workflow
- 2021-10-05: Draft is prepared, with a similar structure to the Mizoram and Manipur report but with additional case studies and interpretation. To be shared soon.